Artificial Turf Installation Burbank

When you have completed the preparation stage which include measuring exactly how much artificial grass you will need, installing appropriate drainage (if necessary) and removing the natural grass layer, you will be able to install your artificial grass lawn. This article outlines the steps you ought to follow to help you to do the job right, from laying the base, connecting joints and preventing weed growth.

Lay Gravel Base accompanied by Sharp Sand – If required, use treated timber/timber stakes to put inside an area frame. We recommend 4 X 2 inches of tantalised treated timber for heavy clay soil areas and poorly draining areas and 2 X 2 inches of tantalised timber permanently draining areas. Screw these timbers to the stakes leaving the stakes on the within the perimeter. In case the Artificial Grass meet a concrete path, wall or decking, position the timber flush with all the surface height and through using 10mm temporary fillet, pack the timber close to the wall leaving the space to help you tuck the Artificial Grass between the timber and also the adjoining material with a later stage.

Position the stakes against the inner perimeter timber edging and hammer into the ground ensuring the stakes are slightly less than the timber edging. Next screw the timber stake for the timber edging. With heavy clay soils we recommend laying a crushed stone surface of up to 3 inches. This will not be necessary for almost all areas and merely required if you have a higher water table where ground holds water for a long period of your time after it rains. Next compact the floor employing a vibrating plate which can be hired from an equipment hire company. Make sure the perimeter is compacted and beneath the timber edging by 1 inch. Infill the perimeter with sharp sand and level using a rake. Ensure the sand is level to the very top from the timber edging and compact again.

For good drainage areas spread a layer of sharp sand to blind on the soil. Next compact the floor using a vibrating plate which can be hired from an equipment hire company. Ensure the perimeter is compacted and level with the timber edging. If you put more work in at this time, your Artificial Grass Lawn will appear better consequently.

Weed Control Layer – Apply the weed control geo textile membrane and cut as necessary. Tack using small 1 inch galvanised clout nails to the timber edging. This weed control geo textile membrane prevents any probability of weed growth with the artificial grass drainage holes.

Roll out Artificial Grass – Lay the Artificial Grass inside the desired direction working on the carpet rather than on the levelled base. Make sure the carpet is positioned to minimise cuts, joints and waste overlaying the timber edging by a minimum of 4 inches. If the artificial grass meets a path or edge, and if you have laid the timber edging correctly as previously described, then your artificial grass may be wedged between. If joining, please be sure that the artificial grass is laid with the pile running inside the same direction on each piece. Lay the carpet on top of the sand rather than dragging it over the base material. To assist stop wrinkles or creasing it is advisable to allow 2 to 3 hours to settle before continuing with jointing and adhesive. Cut grass to shape employing a sharp Dolphin or Stanley knife or scissors.

Jointing – When jointing your outdoor carpet together, guarantee the pile runs in the same direction. Cut off manufacturer’s edge strip (if present) and butt two edges together ensuring you can find no gaps greater than 1mm between the two carpet edges. The accuracy with this determines how visible the join is after the completion. Fold back edges and position jointing tape (smooth side down) so the edges of the carpet fulfill the tape when joined.

Adhesive – a) Apply the cartridge adhesive in a zig zag motion onto the rougher side of the tape allowing one cartridge for every 3 linear metres. Turn down carpet and press both edges into the wet adhesive, ensuring every piece marries up and has no overlap. As you are accomplishing this along with your fingers, mix the fibres together to conceal the join. When the whole length is at place and also you are pleased with its appearance it is actually required to walk along the join several times to activate the glue and bond the grass for the tape. Weigh down the seam to ensure good contact with the glue until it cures. The more care taken with the operation the neater and tidier the joint will be.

b) If making use of the 2-component multi-purpose adhesive, ensure thorough mixing of the two components before use. Apply adhesive for the rough side in the tape and spread evenly across a width of a minimum of 20cm using if at all possible a notched trowel. Sufficient adhesive should be applied to ensure that if the artificial grass carpet is pressed in to the adhesive, a transfer over the carpet backing is complete. Turn down carpet and press both edges in to the wet adhesive, ensuring every piece marries up and contains no overlap. Ensure the carpet will not crest at the seam and is also holding flat on the bonded area. After the whole length is within place and also you are pleased using its appearance it is actually essential to walk over the join several times to activate the glue and bond the grass for the tape. Weight the seam to make sure good connection with the glue until it cures. The greater care taken using the operation the neater and tidier the joint will likely be.

While you should endeavour to not put adhesive to the carpet small quantities of glue can be removed from your artificial grass fibre using White Spirit and a small off cut from the artificial grass. Small amounts of cured glue usually can be removed. To avoid this situation and the potential of harm to the artificial grass, care and precautions should be taken to avoid vhhfqr with all the fibres at all times. Once the artificial grass has become jointed and glued and also you are happy using the levels screw the grass towards the timber perimeter framework using galvanised screws at a minimum of 12 inch intervals.

Spread Sand (Optional, based on Grass Selected) – When the artificial grass continues to be laid use silica sand, which is kiln dried and brush into carpet as you go. Each product could have sand infill but this is only utilized to stabilise the carpet as well as at virtually no time if the sand be visible. You have to get an even spread on the surface using a brush to build up the depth in layers. Do not apply the sand in a single application. Brush sand into pile right after laying whilst the artificial grass is dry even though weather conditions are good. Brush vigorously up against the fibres of the carpet pile to encourage the tufts to stand upright. Putting the proper quantity of sand in helps support the artificial grass to bed down, protects the fibres as well as keeps them standing allow it the look of real grass.

Artificial Grass Installation Burbank – Find Out More..

We are using cookies on our website

Please confirm, if you accept our tracking cookies. You can also decline the tracking, so you can continue to visit our website without any data sent to third party services.